Residential · New Cairo
A villa redesigned to save 18% in build cost
- Challenge
- A construction quote far beyond budget.
- Approach
- Re-engineered layout, full BOQ, every detail resolved pre-tender.
- Result
- Contractors bid against a precise document.
18%Build cost saved
0Site reworks
